Vinyl liner
Cheapest to start, costly to keep
- Liner replaced every 4 to 7 years
- Tears and fades in the sun
- Limited shapes and steps

A real concrete pool. Without the luxury markup. Custom gunite pools from $64,999, built by our own crew.
2016
Building Carolina pools since
600+
Pools in the ground
30+
Years of Eddie's experience
4
Finished pools at our showroom
Any shape, any size, any depth. Every CPC pool is custom concrete, designed around your yard, your budget and how you swim.

Clean lines, sun shelves, lap lanes and lakefront modern.

Curves that follow your yard, with rock, water and lighting features.

A spa built into the pool, raised or flush, spilling over or not.

Big-pool feel for smaller yards and tighter budgets.
Any shape. Any size.
Yours.
Tell us about your yard and we'll design around it.
Four showroom designs you can walk around in Denver, then make your own.
Come walk the dream
Skip the Pinterest boards and 3D renderings. Our 5-acre showroom has four finished pools you can walk around, touch and compare.
5
acres of real pools
4
finished pools to compare
4206 Sugar Wood LnDenver, NC 28037Mon-Fri 8am-6pm, Sat by appointment
Get directionsMost pool companies sell the job and hand it off. We run it ourselves, start to finish, out of Denver, NC since 2016.
The corporate builder

Don't call Lenny.
Call CPC.
Lenny sells the dream and vanishes in a new Porsche. These are our trucks, our equipment and our yard.
How we build
Step1of 7How we build
We mark your pool and spa on the lawn, dig them out and haul the dirt away. A laser sets the grade from the sun shelf down to the deep end.
A rebar grid on chairs lines every wall and the floor. Drains, returns and the skimmer are plumbed and trenched to the equipment pad.
Our nozzleman sprays concrete over the steel and the crew trowels it into one solid, curved shell with a bond beam on top.
Waterline tile goes around the top of the wall, then coping stones cap the edge all the way around.
Pavers or a concrete deck go down around the pool. The pump, filter and heater are set on their pad and wired up with the pool lights.
The finish coat goes on in the color you pick. Plaster is what gives your pool its color, not the water.
We fill the pool and spa, start up the equipment and balance the water. Then we walk you through pool school and it's ready to swim.
We used to build all three. We stopped building fiberglass and vinyl because concrete is the one that holds up in Carolina clay and heat.
Vinyl liner
Cheapest to start, costly to keep
Fiberglass
One size fits most, rarely just right

CPC concrete
Built for your yard, built to last
From simple to sensational
We build around Lake Norman and west of Charlotte, from our yard in Denver, NC. If your town isn't listed, ask anyway.
The questions we hear every week. If yours isn't here, call and a real person picks up.
704-728-3520You made it to the deep end.
Tell us about your yard. Eddie's team calls within 1 business day with a real number, not a sales pitch.